Our company personnel participated in the design and supply of key equipment for the transformation, upgrading, relocation, and renovation project of Xingtai Iron and Steel Group. The bottom plates of SRV furnaces 1 # and 2 # in the ironmaking area have been assembled, and the installation of furnace shells is in progress; 1 # and 2 # rotary kilns are ready for pouring; 1. The installation of dry dust removal equipment has been completed and handed over; The AD axis frame columns of the gas film greenhouse have been sealed and are ready for pouring; The core equipment related to vaporization flue, waste heat boiler, and granular coal preparation, which are matched with the smelting reduction furnace, are being synchronously processed and manufactured.