DRI HIsmelt

DRI HIsmelt


Capacity: 600,000TPA DRI HIsmelt Jianlong Group Inner Mongolia Saisipu 

Add: Wuhai, Inner Mongolia

Tech: HIsmelt, DRI, Smelting tech, No pellet/no coke

Mine report—Market survey—EPS

Iron Ore: TFe≥55%, SiO2≤7%, Al2O3≤5%, P≤0.175%

Fuel: Pulverized coal Bituminous coal, HV≥6000kcal/kg

EPC period: 18months 

Investment: 1.4billion CNY